A stoppage is only useful if somebody wrote down what caused it, how long it lasted and what was replaced. Solmex makes that the path of least resistance: one tap from the operator opens the fault, the line's status changes itself, and the clock runs until the repair is signed off.
Manufacturing
Because the clock starts at the operator's report and stops at the sign-off, the downtime figure is not an estimate somebody typed afterwards. Every stoppage carries its cause, its parts and its labour, so the argument about which line is really costing you is over.
A compressor that ran two shifts last month is due before one that ran one, and the plan says so on its own. Calendar intervals are there when a certificate demands a date rather than a number.
Receipts, issues, returns and adjustments are the only four things that touch stock, and an issue goes against the work order that used it. Today's quantity always has a paper trail behind it.
Operators, technicians and storemen all work from a phone, and field seats are free on every plan including the free one. Nothing waits for somebody to reach a desk and retype it.
Bring last month's stoppage log. We will put it on a line-by-line timeline and you can see what it has been costing.
NO COMMITMENT · YOUR DATA STAYS YOURS