Sector · Mining and Quarrying02 / 17

The pit does not stop. Neither does the register.

A haul fleet and a crushing plant fail in completely different ways, and most systems make you choose which one to model properly. Solmex keeps both on one asset register: the truck serviced on engine hours, the crusher on liner wear and running hours, the conveyor on a calendar inspection.

Haul trucksWheel loadersExcavatorsCrushersScreensConveyorsDewatering pumpsGensets
Assets184
Running151
Service due9
Down6
Hours logged 7d9,410
The register, liveNORTH BENCH · PRIMARY CIRCUIT
Pit and plantNORTH BENCH · PRIMARY CIRCUIT
HT-207
Haul truck, 40 t12,480 h · 500 h service in 62 h
Running
CR-002
Jaw crusher, primaryLiner at 78% wear · inspection raised
Watch
WL-041
Wheel loaderHydraulic leak reported 06:40 · WO open
Down
CV-014
Overland conveyorIdler inspection · monthly · signed 04 Aug
Passed
hours · cycles · calendarone register

Mining and quarrying

Three ways to schedule. One asset register.

A haul truck is due on engine hours, a screen deck on tonnes through it, a walkway on a monthly inspection date. Solmex schedules all three off the same template engine, so the plan for the whole site is one queue rather than three spreadsheets that disagree.

What it carries here03 STATIONS
METERS

Hours read where the machine is

Meter rounds are entered on a phone at the machine, or straight off the fuel bowser as it fills. Readings that fight the record are refused at the point of entry, not discovered a month later in a report.

Meter entry paths3
DOWNTIME

Downtime counted from the report

An operator reports a fault in one tap and the machine's status flips itself. The clock starts then, not when somebody gets round to opening a work order, so the downtime figure is the real one.

Taps to report a fault1
COST

Cost lands on the machine

Fuel logged at the bowser and parts issued off the shelf both post themselves against the machine that consumed them. Cost per haul truck is a number you can already see, not a month-end exercise.

Auto-costed sources2
Below the waterlineREADINGS

The pit is measured in hours. So is the plan.

Scheduling bases per template3
Assets on one registerunlimited
Readings without a paper trail0

Bring a week of pit data and we will load it: haul fleet, crushing circuit, the lot. You will see cost per machine before the call ends.

NO COMMITMENT · YOUR DATA STAYS YOURS

Prev · Construction Next · Fleet and Heavy Equipment
The same register, sixteen other rooms16 MORE